Eduproject.com.ng logo - RESEARCH PROJECT TOPICS AND PROJECT TOPICS ON EDUCATION

BUILDING TECHNOLOGY PROJECT TOPICS AND RESEARCH MATERIALS


  • 21. ROAD DETERIORATION.

    » ABSTRACT This project report is a study carried out to determine the causes and remedies to road deterioration. A case study of Naze Junction to Futo Gate Road, this study talks about the existence and development of tacks, researches made to discover the causes and remedies of road deterioration, the road structure/road maintenances. This project covers the methods used to determine the cause of ...Continue Reading »

    50 pages |  -1 engagements | 

  • 22. ASSESSMENT OF THE CONTRIBUTIONS OF HYDROLOGIC CYCLE TO THE WATER QUALITY PROFILE...

    » ABSTRACT This Research or project is on the Assessment of the contributions of the hydrologic cycle to the water quality profile of Otamiri River. Since the quality of the River is polluted by the waste from different sources. This project or research which its objective is to find out exactly the contributions of the hydrologic cycle to the water quality of otamiri river and the health implicatio...Continue Reading »

    50 pages |  -1 engagements | 

  • 23. EFFLUENT IMPACT ON WATER QUALITY.

    » ABSTRACT This project work was aimed at determining the effect of effluent on Aba River. This became pertinent owing to the fact that companies discharge their effluent into the river without treatment. Four different samples were collected from four locations and analyzed, which include Upstream Sample (A), Unilever Effluent (B), Nigeria Breweries Effluent (C), and Down Stream Sample (D).The resu...Continue Reading »

    50 pages |  -1 engagements | 

  • 24. RELEVANCE OF ROAD TO LIFE AND IT'S ACTIVITIES.

    » GENERAL INTRODUCTIONThe relevance of road to life and its activities cannot be over emphasized.Road is as old as the origin of man and plays a vital role in the life of the people in communities, states, countries. It is quite obvious that life would have been very difficult without the existence of roads. Nigeria for instance acknowledged the importance of road such that the local, state and fede...Continue Reading »

    50 pages |  -1 engagements | 

  • 25. STRUCTURAL DETAILING OF A REINFORCED CONCRETE STRUCTURE - DUPLEX.

    » INTRODUCTIONThe work in the construction industry involves the client, the Architect, the Engineer, the quantity surveyor and the builders. A structural project is initiated by the Engineer (Civil Engineer).The process of designing begins with the Engineers appreciation of the client’s requirements. After the specification given to the Engineer by Architect according to the requirement of th...Continue Reading »

    50 pages |  -1 engagements | 

  • 26. STRUCTURAL REINFORCEMENT DETAILING OF A SINGLE STOREY RESIDENTIAL BUILDING WITH ...

    » INTRODUCTIONBefore a designer can relate his requirements dearly in a construction industry, a drawing is to be prepared; this is because the drawing serves as a general means of communication. Thus, the drawing is adopted mostly, then other means of communication in engineering sectors.A structured engineer mostly engages himself in designs on construction of structures. Like roads, bridges, rail...Continue Reading »

    50 pages |  -1 engagements | 

  • 27. GROUNDWATER DEVELOPMENT FOR PORTABLE WATER SUPPLY.

    » ABSTRACT Groundwater hydrology may be defined as the science of the occurrence distribution, and movement of water below the surface of the earth. Geochydrology has an identical connotation, and hydrogeology differs only by its greater emphasis on geology. Utilization of groundwater dates from ancient times, although an understanding of the occurrence and movement of subsurface water as part of th...Continue Reading »

    50 pages |  -1 engagements | 

  • 28. DESIGN OF ROAD PAVEMENTS DESIGNING OF ROAD PAVEMENT LINKING FEDERAL SECRETARIAT ...

    » ABSTRACT This thesis on a project undertaken by the author is aimed at providing explanation of the basic theory of the work of road design and its associated activities also, to cover practical methods of working.In pursuit of the meaningful completion this project a lot of investigation was embarked with principles and practice of road construction. The total distance of route was determined and...Continue Reading »

    50 pages |  -1 engagements | 

  • 29. AN EVALUATION OF THE ENVIRONMENTAL FACTORS THAT LEAD TO ABANDONMENT OF PUBLIC BU...

    » ABSTRACT The successful implementation of building projects may be impaired without a good knowledge of the environmental factors that contribute to building projects abandonment and this abandonment makes it difficult to achieve the benefit to be derived from the projects. The aim of the study was to evaluate the environmental factors that lead to abandonment of public building projects, with a v...Continue Reading »

    50 pages |  -1 engagements | 

  • 30. COMPARATIVE OF CONSTRUCTION PROCESSES OF INNOVATIVE AND CONVENTIONAL BUILDING.

    » ABSTRACT Building, civil engineering and heavy engineering projects are major contributions from the construction industry to national development. Buildings occupy the central focus of any infrastructural development and it is constructed to basically provide the citizenry with safe and comfortable enclosure for abode, business and industrial activities in enclosures free from the vagaries of the...Continue Reading »

    50 pages |  -1 engagements | 

  • 31. ECONOMIC DEVELOPMENT AS A FUNCTION OF CONSTRUCTION PROJECT PERFORMANCE.

    » ABSTRACT Poor performance of construction projects is one of the major cause for concern in the construction industry. Many of the construction projects executed in Nigeria experienced several challenges ranging from simple to complex issues. This paper therefore, examines factors affecting the performance of construction projects, their effects on the economic development and the impact of the fa...Continue Reading »

    50 pages |  -1 engagements | 

  • 32. MODELLING OF COST OVERRUNS IN BUILDING PROJECTS.

    » ABSTRACT Construction of building projects is an endeavour that involves capital expenditure, which is either borrowed or self financed by clients. The expected outcome of such expenditure is value for money, which is usually dictated by project objectives of cost, time and quality. Project cost, as a project objective, is a crucial determinant of project success in the prevailing economic challen...Continue Reading »

    50 pages |  -1 engagements | 

  • 33. EVALUATION OF PROJECT RISK AND THE DETERMINATION OF CONTINGENCY SUM FOR BUILDING...

    » ABSTRACT The construction industry is characterised with inherent risk and uncertainties as a result of its fragmented and competitive nature. This therefore makes it difficult to accurately estimate the cost of construction project. To achieve the objective of having work completed most especially within cost and quality, contingency sum is apportioned to cater for unforeseen items of work that m...Continue Reading »

    50 pages |  27 engagements | 

  • 34. EFFECTS OF THREE BINDING MEDIA ON MOISTURE MOVEMENT IN COMPRESSED EARTH BRICKS.

    » ABSTRACT The major problem associated with cassava starch stabilized bricks is the high rate of water absorption. The effect of high rate of water absorption make the bricks to be soluble in water and limits its use for only internal partition walls not out doors. This study therefore evaluates the effects of three binding media on compressed stabilized earth bricks. The three binding media are Ma...Continue Reading »

    50 pages |  45 engagements | 

  • 35. DETERMINATION OF THE PROSPECT OF PARTNERING AS PROCUREMENT METHOD IN THE NIGERIA...

    » Abstract Due to the complex nature and characteristics of the industry, adversarial attitudes are usually involved and therefore, new ways in carrying out management processes to attain an improved performance and a qualitative project delivery in the industry is necessary. Partnering is a set of strategic action that deliver marked improvements in construction performance and project success will...Continue Reading »

    50 pages |  41 engagements | 

  • 36. ANALYTICAL AND APPROXIMATE VARIANCE OF PUBLIC BUILDING TOTAL PROJECT COST, ESTIM...

    » ABSTRACT Building construction project has become an everyday issue, and this involves the spending of hard earned money by the project owner called the client. The expectation of the owner of any building project is justification of good project delivery. This is enabled by the objectives of the project which definitely includes project cost that envelopes the cost and quality of delivery at the ...Continue Reading »

    50 pages |  30 engagements | 

  • 37. AN INVESTIGATION INTO BUILD OPERATE AND TRANSFER IN THE PROVISION OF HOSTELS.

    » ABSTRACT Inadequate hostel for students in Universities has been of great concern to Government and the University authorities. The Government has been trying to involve the private sector in the provision of hostel through Build Operate Transfer scheme since 2004. Challenges have been faced in implementing the scheme. The aim of the study was to investigate the slow adoption of the University Bui...Continue Reading »

    50 pages |  29 engagements | 

  • 38. AN EVALUATION OF HOUSING AFFORDABILITY FOR NIGER STATE CIVIL SERVANTS UNDER PUBL...

    » ABSTRACT Niger state government achievement in Public housing delivery for its citizen since its creation in 1976 has been very minimal–with just 3,000 houses provided for a population of 3,954,772 so far. Changing its delivery strategy from being the sole provider of housing, the government in 2007 opted for a new strategy of Public Private Partnership (PPP) which was to provide affordable ...Continue Reading »

    50 pages |  44 engagements | 

  • 39. AN ASSESSMENT OF THE IMPLEMENTATION OF UNIVERSAL DESIGN PRINCIPLES IN THE PROVIS...

    » ABSTRACT Universal design (UD) can be described as the design of products and environments to be usable by all people to the greatest extent possible, without the need for adaptation or specialized design, thus bridging the gap between housing and disability though the concept of Universal Design or ‘Design for all’ has been neglected in most developing countries including Nigeria. Thi...Continue Reading »

    50 pages |  27 engagements | 

  • 40. AN APPRAISAL OF CONSTRUCTION PROJECT PLANNING IN NIGERIAN INDIGENOUS CONSTRUCTIO...

    » ABSTRACT Planning in construction involve defining the activities, actions, time, cost, durations and performance milestone which will result into successful completion of the project. Previous researches attributed insufficient construction planning to Nigerian indigenous construction companies, this insufficiency in construction planning was found to contribute to their low productivity, profita...Continue Reading »

    50 pages |  43 engagements | 

. ABSTRACT, Proposals, Literature Reviews, Aims & Objectives, Methodology, Surveys & Implementations