PROJECT TOPIC: TAKING OFF PROCESSES AND PREPARATION OF AN UN-PRICED BILL OF QUANTITIES

Project Body:


CHAPTER ONE

1.0    INTRODUCTION

In partial fulfillment for the requirement of the award of National Diploma (ND) in Quantity Surveying, student will have to demonstrate what have been taught in class and outside the class during SIWES.

Thus, this project which is a group work is aimed at taking off and preparing a Un-Priced Bill of Quantities for the proposed Four (4) Bedroom Fully Detached Duplex at plot 3003A and 3003B Sanbowlugbe East Extension Layout Cadastral Zone 07-07 Abuja Nigeria.

This project is also aimed at exposing us to practical aspect of what were not taught in class and also enable us know more better about what has already been taught in the class.

1.1    DESCRIPTION OF WORK

The project as it is fully shown on the building drawing or plan is the construction of a proposed four (4) Bedroom fully detached, duplex at 3003A and 3003B Sambowlugbe East Extension layout cadastral Zone 07-07 Abuja, Nigeria, for: Rainbow workstation service Ltd.

This project work includes the process of taking off for the building, abstracting and the process of preparing an un-priced bill of quantities for substructural work only.

1.2    AIMS & OBJECTIVES

1.2.1           AIMS

The aim of this project work is to prepared a taking off for quantities completely for four (4) bedroom fully detached duplex and to prepare an abstract and un-priced bill of quantities for the sub structural work.

1.2.2 OBJECTIVES

In order to achieve the aforementioned aims, the following objectives are carried out.

-      To prepare literature review of some terms for better understanding of the little of the project.

-      To prepare a taking off and squaring quantities for four (4) bedrooms fully detached duplex.

-      To prepare an abstract for substructure work only.

-      To prepare an un-priced bill of quantities for substructure work only.

1.3    SCOPE AND LIMITATION

The scope of this work is limited to the processes that are involved in taking off and preparing an un-priced bill of quantities for building work but excluding the abstracting, un-priced bill of quantities and service for super structural work.