Eduproject.com.ng logo - RESEARCH PROJECT TOPICS AND PROJECT TOPICS ON EDUCATION

QUANTITY SURVEYING PROJECT TOPICS AND RESEARCH MATERIALS


  • 1. ANALYSIS OF THE IMPACT OF FEASIBILITY VIABILITY STUDY ON CAPITAL PROJECT DEVELOP...

    » CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Until relatively recently, the discipline of development appraisal has remained the provenance of surveyors and developers. It largely been ignored by other participants in the development process, particularly planners, architects and construction specialists. This is now changing. Close attention is now paid to the feasibility and viability (a...Continue Reading »

    50 pages |  4 engagements | 

  • 2. THE ROLE OF PROJECT STAKEHOLDERS IN RISK MANAGEMENT OF BUILDING PROJECTS

    » ABSTRACT All construction projects involve certain degree of risk regardless of its sizes. This is as a result of unique feature of the industry. This study therefore identified risk factors that are associated with building project. It also evaluates the level of involvement of project stakeholders in management of risk and evaluates the various strategies available for mitigating risk. Data were...Continue Reading »

    90 pages |  18 engagements | 

  • 3. APPRAISAL OF MATERIALS MANAGEMENT ON CONSTRUCTION SITES IN YENAGOA, BAYELSA STAT...

    » ABSTRACT Construction materials constitute a huge portion of the total construction cost of any project; as such these construction materials should be well managed on site. In recent times where construction material prices are on a regular increase, improper handling, poor storage etc. can lead to serious materials wastage and eventually time and cost overrun of projects. As solution to the prev...Continue Reading »

    92 pages |  14 engagements | 

  • 4. THE EFFECT OF TIMELY DELIVERY OF CONSTRUCTION PROJECTS ON THE ECONOMIC DEVELOPME...

    » CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Time impacts are inevitable on construction projects, primarily because of the uniqueness of each project and the limited resources of time and money that can be spent on planning, executing and delivering the project. Time factors are inherent in all of project construction undertakings. Construction projects have long been recognized as partic...Continue Reading »

    65 pages |  69 engagements | 

  • 5. AN ASSESSMENT OF THE EFFECT OF ORGANISATIONAL CULTURE ON THE PERFORMANCE OF QUAN...

    » CHAPTER ONE INTRODUCTION 1.1 BACKGROUND TO THE STUDY Organizational culture defines the way employees complete tasks and interact with each other in an organization. The cultural paradigm comprises various beliefs, values, rituals and symbols that govern the operating style of the people within a company. Corporate culture binds the workforce together and provides a direction for the company. In t...Continue Reading »

    65 pages |  67 engagements | 

  • 6. AN ASSESSMENT OF THE IMPACT OF WORK ENVIRONMENT ON THE PRODUCTIVITY OF CONSTRUCT...

    » CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF STUDY Productivity has become the buzzword of the time as it is generally agreed that the more productivity the better. However, productivity in construction industry is discouragingly low. The effect of this cannot be overemphasized. Aboyade (1966) believed a country’s development process depends on the capacity of the country’s construction ...Continue Reading »

    65 pages |  62 engagements | 

  • 7. ANALYSIS OF IMPACT FEASIBILITY/VIABILITY STUDY ON CAPITAL PROJECT DEVELOPMENT IN...

    » ABSTRACT The business of embarking investment involves risk and as such, it requires systematic planning. The whole idea of feasibility studies revolve around conscious efforts at business planning, hence a feasibility study is a comprehensive and rigorous business planning process . Many investors especially in developing countries embark on industrial projects without pre investment studies to a...Continue Reading »

    65 pages |  65 engagements | 

  • 8. LAYOUT SURVEY OF HOUSING AREA P (POCKET) RESIDENCE IN OWERRI WEST LOCAL GOVERNME...

    » Abstract This project report which is aimed at producing a layout and parcellation survey of a portion of housing area P in Owerri west L.G.A has five chapters. The introduction, data analysis, literature review, methodology and finally conclusions and recommendations. Chapter one is about the introduction where the background of the study was considered. The statement of the problem which led to ...Continue Reading »

    65 pages |  66 engagements | 

  • 9. ROUTE SURVEY OF UMUOKOTO (ASSEMBLIES JUNCTION) TO MECHANIC VILLAGE IN OWERRI WES...

    » Abstract This project has been undertaken in partial fulfillment for the award of higher National Diploma (HND) in surveying and geo informatics. The objective is to create a data that will depict/show the undulating nature of umuoko – mechanic village road in other to have an engineering design that will facilitate its future construction. This project is made up of five chapters, chapter o...Continue Reading »

    65 pages |  85 engagements | 

  • 10. RISK MANAGEMENT PRACTICE IN CONSTRUCTION PROJECT (A CASE STUDY OF EBONYI STATE)

    » Abstract The construction project is full of risks and uncertainty due to its nature and this made its project unattractive for non—risk takers. This study is designed to inquire into the risk management practice in construction projects. With a view to establish how risk are perceived in project, the use of risk management process (RMP) in managing risk and how risk change in a project. Dat...Continue Reading »

    65 pages |  53 engagements | 

  • 11. AN EXAMINATION OF THE ROLE OF VALUE ENGINEERING ANALYSIS IN THE CONSTRUCTION IND...

    » Abstract This research is aimed at bringing to the fore value engineering by ascertaining its levels of application and enumerating its roles and challenges facing it in the Nigerian construction industry. Null hypothesis was formulated and tested with t test of independent means and research question was posed. Research structured and open questionnaire and oral interview through personal contact...Continue Reading »

    65 pages |  58 engagements | 

  • 12. THE REVIEW OF CHALLENGES AND PROSPECT OF PUBLIC PROCUREMENT ACT 2007 IN THE EXEC...

    » ABSTRACT In the public procurement system in Nigeria has over the years been abused leading to cost inflation, delay in project delivery, poor quality of work, and project abandonment. The aim of this study is to examine the impact of the due process policy on construction projects delivery in Nigeria. Data were collected using a structured questionnaire distributed to 52 random selections of cons...Continue Reading »

    85 pages |  60 engagements | 

  • 13. THE PROSPECTS OF HUMAN RESOURCE MANAGEMENT IN ENHANCING HIGHER PRODUCTIVITY IN A...

    » CHAPTER ONE INTRODUCTION BACKGROUND OF THE STUDY Management of human resources is that functions of the enterprises which provides for effective utilization of people to achieve both the objectives of the enterprises and satisfaction and development of employees. The survival of any organization depends on the proper management of its materials financial and human resources. The management of all ...Continue Reading »

    85 pages |  -1 engagements | 

  • 14. APPLICATION OF GEOINFORMATICS TECHNIQUES IN CONTROLLING FLOODING IN VULNERABLE R...

    » Background to the Study The acronym GIS stands for geographic information system, it is a system which allows a capture, updating and displaying of a number of previously unconnected dataset bringing them into a common reference system for spatial analysis from which relationship can be identified and decisions made (Sowton 1991). Floods are probably the most recurring, widespread, disastrous and ...Continue Reading »

    85 pages |  61 engagements | 

  • 15. THE EFFECT OF EFFECTIVE CONTRACT PLANNING ON CONTRACTORS

    » ABSTRACT Effective contract planning in construction projects is not only crucial to attainment of project objectives but necessary if project failure is to be avoided, losses minimised and profitability enhanced by the Contractor. While research has shown general low usage of formal and effective contract planning in the UAE, Hong Kong, Kuwait, UK and Ghana, the practices used by Nigerian Constru...Continue Reading »

    85 pages |  -1 engagements | 

  • 16. THE EFFECT OF TECHNOLOGY IN THE FIELD OF QUANTITY SURVEYING AND HOW IT AFFECT CO...

    » BACKGROUND TO THE STUDY The construction industry has recently witnessed a paradigm shift from traditional paper based method of service delivery to electronic information exchange using Information Technology (IT), at least in the western world like UK. It is now evident that the adoption of Information Technology can enhance construction productivity and improve communications for effective deci...Continue Reading »

    85 pages |  -1 engagements | 

  • 17. ASSESSMENT OF TUE FACTORS MITIGATING THE EFFECTIVE PREPARATION OF COST ESTIMATE ...

    » ABSTRACT This research assesses the factors mitigating the effective preparation of cost estimates at the design stage Accurate cost estimates are crucial to the effrctive realization of construction projects. This research is aimed at examining the factors affecting accuracy of pre lender cost estimate in Abuja, with a view to improving the predictive ability of clients, consultants, and contract...Continue Reading »

    85 pages |  -1 engagements | 

  • 18. ASSESSMENT OF TUE FACTORS MITIGATING THE EFFECTIVE PREPARATION OF COST ESTIMATE ...

    » ABSTRACT This research assesses the factors mitigating the effective preparation of cost estimates at the design stage Accurate cost estimates are crucial to the effrctive realization of construction projects. This research is aimed at examining the factors affecting accuracy of pre lender cost estimate in Abuja, with a view to improving the predictive ability of clients, consultants, and contract...Continue Reading »

    85 pages |  61 engagements | 

  • 19. ASSESSMENT OF THE FACTORS MITIGATING THE EFFECTIVE PREPARATION OF COST ESTIMATE ...

    » ABSTRACT This research assesses the factors mitigating the effective preparation of cost estimates at the design stage Accurate cost estimates are crucial to the effective realization of construction projects This research is aimed at examining the factors affecting accuracy of pre lender cost estimate in Abuja, with a view to improving the predictive ability of clients, consultants, and contracto...Continue Reading »

    85 pages |  55 engagements | 

  • 20. AS-BUILT SURVEY OF MEDIUM DENSITY LAYOUT,IKOT OFFIONG, IFUHO, IKOT EKPENE LOCAL ...

    » CHAPTER ONE 1.0 INTRODUCTION As built survey has been an essential element in the development of the human environment since the beginning of recorded history. It is performed to verify that a particular improvement on a parcel of land has been built according to the proposed design plans, specifications and setback requirement. It shows how any field change made during construction fit the overal...Continue Reading »

    65 pages |  -1 engagements | 

. ABSTRACT, Proposals, Literature Reviews, Aims & Objectives, Methodology, Surveys & Implementations