Project Body:


CHAPTER ONE

INTRODUCTION

STATEMENT OF PROBLEM

A scheduling situation in a transport company develops when buses are expected to dispatch effectively.

Scheduling needs the dispatch and general information about routes to generate optimal transportation resources schedules. Lack of management and scheduling modules have cause a big problem for most transport companies. As a result of these problems, these transport companies have not been able to present charts and text reports for these companies.

These transport companies can not export solutions as text files in MS Word or MS Excel.

Lack of scheduling algorithms have led to lack of generating of the different resources schedules.

Lack of near-optimal resources schedules generation have prevented benchmarking an existing solution. Existing routes along with resources assignments can not be imported into the system “as is’ and calculate to reproduce the benchmark solution. The solution can not be generated and compared to the benchmark solution. The two solutions cannot be compared in the form of reports and Grantt Charts to identify opportunities for better resources utilizations.

Route data can not be imported in the form of ASCLL files.

There is no data import wizard that will guide user’s through a set up process for importing route data into the system. Lack of data view to enable user’s to sort the routes based on different criteria (route ID) Departure Time etc).

PURPOSE OF THE STUDY

This research work is meat to find out whether the above mentioned problems can effectively be eradicated by employing computer system to control the scheduling system of a transport company. In other words, to find solution to these problems mentioned above using a computer system.

AIMS AND OBJECTIVES

The aim and objective of this research work is to come up with a more suitable scheduling system in a transport company. (A computer based scheduling system) that can eliminate completely the above mentioned problems using a computer system. For instance, to come up with a scheduling system that can generate optimal buses and driver schedules for a given dispatching scenario.


Disclaimer: Using this Service/Resources: You are allowed to use the original model papers you will receive in the following ways:
  1. 1. This material content is developed to serve as a GUIDE for students to conduct academic research work
  2. 2. As a source for additional understanding of the subject.
  3. 3. As a source for ideas for your own research work (if properly referenced).
  4. 4. For PROPER paraphrasing (see your university definition of plagiarism and acceptable paraphrase)
  5. 5. Direct citing (if referenced properly)
  6. Thank you so much for your respect to the authors copyright.

Useful Links:

Related Projects