Project Body:


CHAPTER ONE

INTRODUCTION

          Computer technology is one of the achievements made by man. Its benefit has seen man being able to solve some of his immediate problems. It has opened the door to a large number of important applications that were not economically feasible in the past. Its applications ranges from automating devices in most offices where most tasks are highly automated to on-line computer control of industrial and commercial process for which this project is concerned.

          The computer therefore presents a great opportunity to develop system more economically not simply because the availability of methodology and theories that could not previously be economically justified, among these numerous applications of the computer is it’s use in controlling and monitoring traffic, this is reality a very expensive application because it has several features to utilize in the design.

          The main reason for embarking on this project is because it is noteworthy that traffic system in ESUT-IMT Road Junction is very poor which results in traffic jams and most of which cause automobile accident within this junction due to congestion among road users with the increasing population and consequent increase in economic activities. However it is noteworthy to note that urban traffic jams are not limited to developing countries alone, but other developed countries still experience the same problem given the nature of their road network.

          The reason as stated above for the problems being encountered for non-application of computer in the monitoring and controlling of the junction is enough to automate the traffic control system using it as the best alternative to direct the flow of traffic effectively and efficiently.

1.1     STATEMENT OF THE PROBLEM

The reason for embarking on this particular project is due to the fact that traffic jam is a problem within this T-junction because it has caused most of the automobile accidents and mishaps. This problem could also be attributed to the mistakes made by traffic policemen who might suddenly stop a line in order to give preference to some class of individuals and therefore pass wrong line or road. Since there is also on increasing population made up of students of the two higher institutions as well as the economic activities, road users experience what can be called ‘a diary ordeal’ as most of their time is spent on the road as a result of congestion cause holdups. This situation affects mainly ESUT and IMT students and lecturers, as they are the major users of this T-junction.


Disclaimer: Using this Service/Resources: You are allowed to use the original model papers you will receive in the following ways:
  1. 1. This material content is developed to serve as a GUIDE for students to conduct academic research work
  2. 2. As a source for additional understanding of the subject.
  3. 3. As a source for ideas for your own research work (if properly referenced).
  4. 4. For PROPER paraphrasing (see your university definition of plagiarism and acceptable paraphrase)
  5. 5. Direct citing (if referenced properly)
  6. Thank you so much for your respect to the authors copyright.

Useful Links:

Related Projects